Descrição
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
3 Comentários
Fechado Wes (Utilizador Registado)
angelibruck@aol.com (Utilizador Registado)
Department of Public Works (Oficial Verificado)